Chemical Clean Up in Milford
(Boston, Mass. – September 24, 2007) – A recent agreement cleared the way for cleanup work to begin at a contaminated drainage swale at 80 Wampus Lane in Milford, Conn. The work is being conducted jointly by EPA and FCI USA Inc. to remove contaminants from the site, including metals (beryllium and lead), polycyclic aromatic hydrocarbons and oils.
The current cleanup, estimated to cost approximately $360,000, will address contaminated surface soils in a 210 foot-long, man-made earthen drainage swale on the property. The swale reportedly received treated plating wastewater, which still contained harmful liquids, between 1965 and 1991.
The 24 acre site likely was contaminated from years of industrial activity on the property, where the manufacturing of electrical components and accessories took place from 1956 to 1999. Operations at the facility included rubber and plastic molding, screw machining, de-greasing and plating as well as waste water treatment. The Conn. Dept. of Environmental Protection (CT DEP) has previously overseen the remediation of two contaminated waste lagoons and a landfill on site. Read the full story here.

Comments